Titan - Plywood
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| ITEM | SIZE |
NO. PCS. |
|
|---|---|---|---|
| LUMBER: | |||
| Framing |
1-1/4" x 4" 1-1/4" x 5" 1-1/4" x 6" 1-1/4" x 7" 1-1/4" x 9" |
70' 50' 6' 4' 10' |
|
| Keel | 1" x 6" x 17' | 2 | |
| Chine logs | 1" NET x 2" x 18' | 2 | |
| Bottom battens |
1" x 2" x 14' 1" x 2" x 18' 1" x 2" x 19' |
2 2 2 |
|
| Sheer clamps | 3/8" NET x 2-1/2" x 19' | 6 | |
| Deck battens, strongback |
1" x 3" x 7' 1" X 2" X 10' |
1 1 |
|
| Carlings | 1" x 2-1/2" x 18' |
2 (partially or all laminated - see plans) |
|
| Cap rail clamps | 3/8" NET x 1" x 25' | 8 | |
| Deck clamps | 3/8" NET x 1-1/4" x 25' | 4 | |
| Rub rail | 1/2" NET x 25' | 4 | |
| Cap rail | 5/8" NET x 3" x 100' | (use initially wider stock for sawing to width) | |
| Motor stringers | 2" x 8" x 4' | 2 | |
| Skeg laminations | Varies with thickness used x 4" wide max. | ||
| Skeg/stem cap laminations | See plans | ||
| PLYWOOD: | |||
| ITEM | SIZE |
NO. PCS. |
|
|
Stem, breasthook, harpins, floor timbers, sternpost |
3/4" x 4' x 8' | 4 | |
| Bottom planking | 1/4" x 4' x 8' | 10 (*)(**) | |
| Side planking | 1/4" X 4' x 8' | 12 (*)(**) | |
| Decking | 3/8" x 4' x 8' | 4 | |
| Gussets, floor timbers | 1/2" x 4' x 8' | 2 (*) | |
|
(*) See plans for size/thickness and other
options (**) See plans for joining methods to permit other panel lengths |
|||
|
Adhesives: Epoxy adhesives are advised throughout the construction. These may be an epoxy adhesive or epoxy resin. Epoxy resins should be used with thickeners (silica or equal) per the instructions with the resin and/or thickening agent. Due to the noted options, the amount required is difficult to estimate. Start with a gallon container of epoxy and after use you will be better able to estimate the total amount required. |
|||
| FASTENING SCHEDULE: This listing suggests the size, type, and spacing or number required of fastenings for various junctions of the basic hull, not including superstructure or any temporary fastenings. See herein for options and alternatives that may vary the listing, including fastening lengths and type. The listing may also need to be varied by the builder when or where required to assure sound, strong junctions and to reflect possible options herein. It is not practical to list every junction for every condition and for this reason, total fastening amounts are not practical. However, from this listing, the builder should be able to make interpolations and estimates. In any case, and in lieu of the listing, screws should be sufficiently long so that at least half the screw length penetrates the joining member. If nails are used, these should penetrate the joining member by 2/3rds their length. Screws should be flat head wood types. In some cases, it will be desirable to counterbore these for greater holding power or for building convenience. Bolts should be carriage bolts or threaded rods with nuts jammed on. Bolt lengths must be taken from the work. However, bolt heads and nuts can be counterbored and recessed somewhat to take advantage of shorter length bolts. Nails are ring-type boat nails with pilot holes pre-drilled first. Screws can be used in place of screws or nails in all cases. Alternately, gun-driven fastenings can be used in lieu of the above as long as permanent fastenings are of marine-type materials as described above. | |||
| JUNCTION | SIZE | TYPE |
SPACING NO. RQD. |
|---|---|---|---|
| Frame/floor timbers | 2" #10 | Screws | 6 per junction |
| Frame/gussets | 1-1/2" #8 | Screws | 5 per junction |
| Deck beams to frames | 2" #10 | Screws | 2 per junction |
| Stem laminations | 1-1/4" | Nails | 6" apart |
| Breasthook laminations | 1-1/4" | Nails | 4" apart |
| Breasthooks to stem | 2" #10 | Screws | 2 min. per |
| Harpin laminations | 1-1/4" | Nails | 4"-6" apart |
| Harpins to sternpost & frames | 2" #10 | Screws | 2 min. per junction |
| Floor timbers to stem | 2" #10 | Screws | 4 per junction |
| Keel first layer/frames | 2" #10 | Screws | 2 per junction |
| Keel laminations | 1-1/4" #8 | Screws | 6" apart |
| Keel to stem & sternpost | 5/16" | Bolts | As shown |
| Bottom battens to frames | 2" #10 | Screws | 2 per junction |
| Chine logs to stem | 2" #10 | Screws | 2 per junction |
| Chine logs to frames | 2" #10 | Screws | 1 per junction |
|
Sheer & deck clamps - First layer @ breasthook |
1-1/2" #8 | Screws | 3 per junction |
|
Sheer & deck clamps - First layer @ frames |
1-1/2" #8 | Screws | 2 per junction |
| Carling/frame junctions | 2" #10 | Screws | 2 per junction |
| Cabin clamp to carling | 1-1/2" #8 | Screws | 6" apart |
| Planking - first layer - all points | 1" | Nails | 2"-3" apart |
| Planking - final @ stem & sternpost | 1-1/4" #8 | Screws | 2" apart |
| Planking - final @ chine & keel | 1-1/4" #8 | Screws | 3" apart |
| Planking - final @ battens | 1-1/4" #8 | Screws | 4"-6" apart |
| Decking | 1-1/4" #8 | Screws | 3"-6" apart |