Neeley's Barrelback - Sacramento

A forum for contacting other builders of Ken Hankinson designs. These designs are now a part of the Glen-L family.

Moderators: Bill Edmundson, billy c

User avatar
Jimbob
Posts: 585
Joined: Thu Jul 25, 2013 1:07 pm
Location: Sacramento, CA

Re: Neeley's Barrelback - Sacramento

Post by Jimbob » Sun Dec 31, 2017 6:34 pm

Here's the weekend progress. I stained the decks and coverboards. Weather permitting, I will spray sealer tomorrow. Then I want to get coats of varnish on the decks so that I can do the white caulk.
Jim
Attachments
20171231_152240.jpg
20171231_152319.jpg
Jim Neeley
Building a Barrelback in Sacramento, CA
viewtopic.php?f=15&t=28089#p172969

User avatar
Rich Coey
Posts: 291
Joined: Fri Feb 02, 2007 10:44 pm
Location: Modesto, CA
Contact:

Re: Neeley's Barrelback - Sacramento

Post by Rich Coey » Sun Dec 31, 2017 7:50 pm

Jim,
Looking good.
From here forward and the mechanicals was the funnest part for me. The changes come fast.
Where are you planning your first launch?

Rich

falconer100
Posts: 74
Joined: Wed Nov 16, 2011 5:33 pm
Location: solihull UK

Re: Neeley's Barrelback - Sacramento

Post by falconer100 » Mon Jan 01, 2018 7:52 am

That looks fantastic. What stain have you used?

alycat
Posts: 200
Joined: Thu Apr 04, 2013 2:17 pm
Location: Shreveport, LA

Re: Neeley's Barrelback - Sacramento

Post by alycat » Mon Jan 01, 2018 9:38 am

That looks great!!! What was your cover board stain formula? Awesome job!!!!!
Will Manwaring
Shreveport, LA

Barrelback 19' stretched to 20'

https://www.facebook.com/media/set/?set ... 3171d9bb06

User avatar
steveh41
Posts: 671
Joined: Mon Jun 14, 2010 7:16 pm
Location: Catheys Valley, CA
Contact:

Re: Neeley's Barrelback - Sacramento

Post by steveh41 » Mon Jan 01, 2018 9:48 am

Ditto! Really great looking stain... terrific job Jim!

Steve
The longest journey begins with a single step… then repeat as necessary!

User avatar
Jimbob
Posts: 585
Joined: Thu Jul 25, 2013 1:07 pm
Location: Sacramento, CA

Re: Neeley's Barrelback - Sacramento

Post by Jimbob » Tue Jan 02, 2018 9:29 am

Thanks everybody!

Rich - not really planing the first launch. My guess maybe a year. I still have to install my engine and get a trailer.

Re: Stain used
Interlux Chris Craft Mahogany # 573 (decks and hull)
Sandusky Chris Craft Dark Walnut Filler Stain #9803 (coverboards and king planks)
I took the stain straight from the can. I didn't want to mix colors in case I had to repair anything later. I already had to re-stain the portion of my
planking that was repaired from when my plainer gouged it.
Jim
Jim Neeley
Building a Barrelback in Sacramento, CA
viewtopic.php?f=15&t=28089#p172969

User avatar
Jimbob
Posts: 585
Joined: Thu Jul 25, 2013 1:07 pm
Location: Sacramento, CA

Re: Neeley's Barrelback - Sacramento

Post by Jimbob » Mon Jan 15, 2018 11:28 am

Got my sealer and 1st coat of varnish sprayed on. White caulk has been ordered. Will be caulkin' soon.
Also made my patterns for the cutwater and transom bands.
Jim
Attachments
20180114_130306.jpg
The nasty part at the tip of the bow is where the fairleader will go. It will cover it up completely.
20180114_130338.jpg
20180114_130356.jpg
Jim Neeley
Building a Barrelback in Sacramento, CA
viewtopic.php?f=15&t=28089#p172969

User avatar
steveh41
Posts: 671
Joined: Mon Jun 14, 2010 7:16 pm
Location: Catheys Valley, CA
Contact:

Re: Neeley's Barrelback - Sacramento

Post by steveh41 » Mon Jan 15, 2018 12:02 pm

Two thumbs up Jim!

Steve
The longest journey begins with a single step… then repeat as necessary!

User avatar
BayouBengal
Posts: 1060
Joined: Tue Jul 31, 2007 7:29 am
Location: Baton Rouge, Louisiana

Re: Neeley's Barrelback - Sacramento

Post by BayouBengal » Mon Jan 15, 2018 2:29 pm

Beautiful work!!! :D

User avatar
Jimbob
Posts: 585
Joined: Thu Jul 25, 2013 1:07 pm
Location: Sacramento, CA

Re: Neeley's Barrelback - Sacramento

Post by Jimbob » Mon Jan 15, 2018 2:45 pm

Thanks guys!
Means a lot coming from my "pier group" .
Jim
Jim Neeley
Building a Barrelback in Sacramento, CA
viewtopic.php?f=15&t=28089#p172969

Hercdrvr
Posts: 719
Joined: Mon May 11, 2015 12:52 pm
Location: McKinney TX

Re: Neeley's Barrelback - Sacramento

Post by Hercdrvr » Mon Jan 15, 2018 7:39 pm

Pretty sweet looking there
Matt B

JimmY
Posts: 665
Joined: Sat Jul 30, 2016 11:08 am
Location: Brighton, MI

Re: Neeley's Barrelback - Sacramento

Post by JimmY » Mon Jan 15, 2018 7:48 pm

Wow, it is really coming to life. Can't wait for the caulk lines.
-Jim
Nothing says poor craftsmanship like wrinkles in your duct tape!

alycat
Posts: 200
Joined: Thu Apr 04, 2013 2:17 pm
Location: Shreveport, LA

Re: Neeley's Barrelback - Sacramento

Post by alycat » Tue Jan 16, 2018 9:56 am

Wow, That is looking really good. What are you using for the caulk lines SikaFlex? or Epoxy?
Will Manwaring
Shreveport, LA

Barrelback 19' stretched to 20'

https://www.facebook.com/media/set/?set ... 3171d9bb06

User avatar
Jimbob
Posts: 585
Joined: Thu Jul 25, 2013 1:07 pm
Location: Sacramento, CA

Re: Neeley's Barrelback - Sacramento

Post by Jimbob » Tue Jan 16, 2018 10:13 am

Thanks everybody!
Will, in answer to your question. "What are you using for the caulk lines SikaFlex? or Epoxy?"

I did a lot of research on this one. I didn't like the 3m 4200 that I used on my strut etc. because it was messy and didn't allow me much working time.
In my research, I found that many people that restore classic boats use Boatlife Life Caulk (polysulfide sealant). It's supposed to be easy to use, easy cleanup, slow cure, sand-able, and is paint-able (important to me as I will varnish over it.). They all say stay away from anything that has silicone in it.
I ordered mine at go2 marine for $18.67 for a 10.2 cartridge.

After I apply the caulk I will apply varnish, and then restripe with white bootstripe paint over the varnish with a striping machine.

I made some practice deck pieces from left over deck planking scraps glued to scrap plywood. Going to play around with them before I attempt the real decks.

Jim
Jim Neeley
Building a Barrelback in Sacramento, CA
viewtopic.php?f=15&t=28089#p172969

User avatar
Jimbob
Posts: 585
Joined: Thu Jul 25, 2013 1:07 pm
Location: Sacramento, CA

Re: Neeley's Barrelback - Sacramento

Post by Jimbob » Mon Feb 05, 2018 10:36 am

The weekend report:
The weather was 70 degrees with no wind, perfect for spraying my 2nd coat of varnish. Managed to get my decals on, and a coat of varnish over them. I also rubbed out the varnish on my ceiling boards going from 320 grit all the way up to 2000 grit, and then hit with polishing compounds with a buffer. (good practice for the rest of the boat). I was thinking about the glen l site where it says "you can build a boat" I am thinking that they could add "if you know how to sand, then you can build a boat" :lol:
I'm really looking forward to caulking the seams next week end.
Jim
Attachments
20180203_155213.jpg
20180203_163527.jpg
Jim Neeley
Building a Barrelback in Sacramento, CA
viewtopic.php?f=15&t=28089#p172969

Post Reply

Return to “Hankinson designs”