Re: Seattle Barrelback progress

Posted: Sun Jul 21, 2019 9:27 am
by RobertCugini
Oh, also bought a $29 dollar drill from Harbor Freight that was a right angle drill, (With plug, no battery!) that worked really well on the tight quarters....

FYI

RC

Re: Seattle Barrelback progress

Posted: Wed Aug 28, 2019 5:21 pm
by RobertCugini
Seats are progressing
Ready to veneer

RC

Re: Seattle Barrelback progress

Posted: Thu Aug 29, 2019 1:10 pm
by mrintense
Nice Robert. What are you going to veneer them with?

Re: Seattle Barrelback progress

Posted: Tue Nov 26, 2019 5:13 pm
by RobertCugini
IMG_1366.jpg
IMG_1365.jpg
IMG_1368.jpg

Re: Seattle Barrelback progress

Posted: Tue Nov 26, 2019 5:15 pm
by RobertCugini
I have a question for the list. Can anyone send me some picture or tell me how they fastened the lifting eyes on a barrelback?

Thanks

Robert

Re: Seattle Barrelback progress

Posted: Tue Nov 26, 2019 8:04 pm
by Jimbob
Hi Robert,
Original barrelbacks had a bracket that was bolted in to a frame in the front of the boat. Those brackets are available but the frames on the glen l boats are not in the correct location. I got a 1/2" bronze rod and put threads on each end. The threads on the lift ring are finer threads than on the other end. I got some stainless angle and made my own bracket that I epoxied and bolted into the stem at the proper location below the deck. In the back I drilled a hole through the curved boards that are attached to the transom and used some of the same bronze rod. The curved boards are about 6-8 inches thick so I figured that was enough. In the front, I doubled up on the king plank so that any lateral movement would not screw up my deck. There are lock nuts for up and down adjustment and so that things don't move around. I will never lift the boat with the lift rings, but I will use the one in the back for a ski rope. I will also use both rings for tying up the boat at the dock. The one on the front of the boat will also be used for my trailer winch strap for retrieval.
Jim

Re: Seattle Barrelback progress

Posted: Wed Nov 27, 2019 6:12 am
by Roberta
Here is a picture of the commonly used lift brackets. There is a threaded lug that slides into the loop that accepts the threaded rod for the lifting eye. I used two on the aft of the Torpedo, attaching them to the motor stringers. For the front, I attached a 3" x 3/8" AL angle spreader bracket to the stringer extensions for the threaded rod. I wanted the eye to be next to the frame deck beam for added strength when retrieving the boat and hauling.

Here is a link to Great Lakes Skipper and some parts that they have.

https://www.greatlakesskipper.com/catal ... ifting+eye

Roberta

Re: Seattle Barrelback progress

Posted: Wed Nov 27, 2019 10:03 am
by Jimbob
Hi Robert,
Here is a picture of the lift ring bracket on an original 1939 Chris Craft.
Jim

Re: Seattle Barrelback progress

Posted: Wed Jan 29, 2020 7:32 pm
by RobertCugini
Been making progress. Ventalators are installed. Trim rail is on, blower has been installed, rudder and steering are installed, water pickup is almost ready for install, fuel tank is in process. Getting closer....
IMG_1441.jpg

Re: Seattle Barrelback progress

Posted: Thu Jan 30, 2020 7:24 am
by hoodman
Looks like you're going to have a really great summer!

Re: Seattle Barrelback progress

Posted: Thu Jan 30, 2020 7:30 am
by Bob Perkins
Looking good!!

Re: Seattle Barrelback progress

Posted: Tue Mar 24, 2020 6:07 pm
by monitor
Robert. Beautiful build!
Can I ask a couple of questions?
I like the way that you laminated the cover board area with the sub deck plywood. Is your sub deck plywood 1/4" ?
Any problems getting it to conform to the curves of the deck?
The plans call for a 3/4" cover board around the perimeter. Did you get that thickness, and how? Is it 3/8" ply under the sub deck(only at the perimeter) plus the 1/3'' mahogany on top of everything?
Thanks much!

Re: Seattle Barrelback progress

Posted: Tue Mar 24, 2020 6:21 pm
by RobertCugini
I carried the 1/4 inch plywood to the edge, then the solid covering board of aprox 5/8 on top of the 1/4. I made a edge strip that covered the edge of the plywood and which the covering board then covered. It worked out well.

Re: Seattle Barrelback progress

Posted: Tue Mar 24, 2020 6:34 pm
by monitor
Thanks Robert.
So all of your finish wood on top of the 1/4" sub deck is 5/8" thick? Your entire deck is 7/8" total thickness?

Re: Seattle Barrelback progress

Posted: Tue Mar 24, 2020 6:43 pm
by RobertCugini
The glue seam ends up on the side and is covered by the rub rail.