Glen-L.com

The Boatbuilder Connection
It is currently Sat Nov 21, 2009 12:49 pm

All times are UTC - 8 hours [ DST ]




Post new topic Reply to topic  [ 28 posts ]  Go to page Previous  1, 2
Author Message
 Post subject: Re: El Guapo is complete!!!
PostPosted: Tue Sep 08, 2009 5:18 pm 
Offline

Joined: Wed Oct 03, 2007 7:10 pm
Posts: 49
Location: Sewickley PA
El Guapo is just beautiful..... congratulations on a beatiful boat!!!! And since no one else has asked this yet, what is the next project ? :?: :?: :?:

Really nice work

Dick Williams


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!!
PostPosted: Tue Sep 08, 2009 6:01 pm 
Offline

Joined: Thu Mar 01, 2007 8:52 am
Posts: 35
Location: Huntersville, NC
Thanks for all the kind complements. They mean so much more coming from folks who have 'been there'!!
Some of you asked a few questions I ill try to answer.

billy c asks:
Nice marquetry pattern on the deck! is that all 1/4" stock or thinner veneer recessed into the Sapele decking?
THE DECK VENEERS WERE ONLY ABOUT 1/8" THICK, TAPED TOGETHER (ON THE TOP) WITH GOBS OF MASKING TAPE THEN GLUED
DOWN IN ONE PIECE ON PRE-CUT 1/4" PLYWOOD SUBSTRATE. (I AM APPREHENSIVE ABOUT HOW ALL OF THIS IS GOING TO 'MOVE' AS TIME GOES ON HOWEVER)
...would you mind if we moved this over to the launch area section so everyone will see the finished boat?
NOT AT ALL (WHAT IS THE 'LAUNCH SECTION'?)


ttownshaw asks:
Is that embossed leather for the seats?
NO IT IS JUST A BASKETWEAVE VINYL (Bordeaux) I GOT FROM GARY'S UPHOLSTERY
http://www.garysupholstery.com/basketvinyl.html#specs


DickWilliams asks:
what is the next project ?
MANGO DAIQUIRIS AND MICHELADAS BY THE POOL IN SAN MIGUEL!


DON'T THINK I WILL MAKE IT TO THE GATHERING, WILL BE IN THE PROCESS OF MOVING DOWN TO MEXICO.
BUT THEN AGAIN...WHO KNOWS??


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!!
PostPosted: Tue Sep 08, 2009 6:33 pm 
Offline
User avatar

Joined: Sun Oct 15, 2006 7:59 pm
Posts: 560
Location: NH
Mark-
thanks for the answer on the beautiful deck work.
i shadowed the topic so you still see a link to it in powerboats but if you look down further in the forum you see "Launching Ramp" where photos and videos (hint) of completed builds are posted.
enjoy your gorgeous boat
-Billy

_________________
I am always doing things I can't do, that's how I get to do them. ~ Pablo Picasso
Belle Isle build


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!!
PostPosted: Tue Sep 08, 2009 7:31 pm 
Offline
User avatar

Joined: Fri Dec 08, 2006 5:21 pm
Posts: 2759
Location: tarpon springs fl
WoodBooger wrote:


DON'T THINK I WILL MAKE IT TO THE GATHERING, WILL BE IN THE PROCESS OF MOVING DOWN TO MEXICO.
BUT THEN AGAIN...WHO KNOWS??



You have to go through Alabama to get to Mexico!!!! :wink:

Beautiful work of art BTW.

_________________
you only regret the things you didn't do

If it doesn't fit right,it isn't

"When you dance, your purpose is not to get to a certain place on the floor. It's to enjoy each step along the way. ~ Wayne Dyer ~ "


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!! (Glenn-L SKI TOW)
PostPosted: Thu Sep 10, 2009 11:05 am 
Offline

Joined: Wed Sep 03, 2008 2:55 pm
Posts: 49
Location: Cloquet MN
I am inspired! Beautiful work Woodbooger!


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!! (Glenn-L SKI TOW)
PostPosted: Fri Nov 06, 2009 8:46 am 
Offline

Joined: Tue Nov 25, 2003 1:33 pm
Posts: 511
Location: Norfolk, Massachusetts
Beautiful boat and I love the deck detail!

I hate to be a downer, but I don't see any vents for the fuel storage area. You have electrical and a non-vented (ie vented overboard) fuel cell in the same compartment. Maybe I can't see them in the pictures. I would hate to hear that you and that beautiful boat went boom.....


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!! (Glenn-L SKI TOW)
PostPosted: Mon Nov 16, 2009 8:06 pm 
Offline

Joined: Thu Mar 01, 2007 8:52 am
Posts: 35
Location: Huntersville, NC
Dan,
re: fuel compartment vents.
Thanks for your keen observation.
The compartment is completely open on each side of the bench seat back.
I don't really know what would be considered adequate ventilation but the compartment is not
as 'enclosed' as you might think.

You have made me more aware of the situation though. Thanks.


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!! (Glenn-L SKI TOW)
PostPosted: Tue Nov 17, 2009 12:16 pm 
Offline

Joined: Thu Aug 20, 2009 2:00 pm
Posts: 119
Location: Leduc (Edmonton), Alberta
I was curious if you have any description/photos of how you built that hinged hatch in the aft deck?

I've been toying with the idea of doing something simular on my Malahini, as they seem quite similar, but I am not sure how I would go about making a hatch area.

_________________
Ian (aka Iggy)


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!! (Glenn-L SKI TOW)
PostPosted: Tue Nov 17, 2009 2:36 pm 
Offline

Joined: Thu Mar 01, 2007 8:52 am
Posts: 35
Location: Huntersville, NC
Iggy,
The SkiTow is the exact boat as the Malahini only slightly shorter.

I regret that I became lax about taking pictures of the building of El Guapo.
Here are a few tips I used in designing/building the 'gull wing' back deck.

I started by laminating four, 1/4"thick by 2" wide 'planks' to conform to radius
of the top of station #1. This is member where the latch is.

I am a big fan of making full size templates or mockups.
In this case, I ripped a bunch of 2" wide strips of 1/4" plywood.
Using light weight clamps, I used the strips to form the plan view of the entire
back deck with all of the strips fully overlapping each other at every corner.
After much trimming and fine tuning at these corners , I then glued and stapled all
of the plywood strips at the overlapping corners.
Basically, I have just made an external skeleton framework of the entire back deck.
See photo below (magenta lines)
I then take measurements and angles directly from the skeleton form to make the actual back deck.

After the back deck frame was made, I then measured for the center
rib piece (green lines). This center piece was ripped in half before final
assembly to the back deck frame. I later sawed the 2 longitudinal pieces in
half with a Japanese pull saw.

In short,I find it much easier to work with forms and mockups using cheap, easy to work
with materials (thin plywood, door luan and foam board. Once the forms are right,
it is very easy to duplicate with the 'real wood'.
See the picture of my foam board template I used to cutout my flooring plywood.

Image

Image


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!! (Glenn-L SKI TOW)
PostPosted: Tue Nov 17, 2009 3:02 pm 
Offline

Joined: Thu Aug 20, 2009 2:00 pm
Posts: 119
Location: Leduc (Edmonton), Alberta
Thanks for the explanation, I think I got it from that.

Your unfinished floor photo triggered makes me wonder what are those strips up the inside of the hull for, the ones between the frame members?

_________________
Ian (aka Iggy)


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!! (Glenn-L SKI TOW)
PostPosted: Tue Nov 17, 2009 3:04 pm 
Offline
User avatar

Joined: Sat Nov 15, 2003 10:42 pm
Posts: 1596
Location: Ontario, Canada
I suspect its the blocking behind a butt joint in the plywood

_________________
Duane Wood
Building a Rebel ( started 01/07/08 )
A Tornado will be next
Glen-L People Helping Glen-L People


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!! (Glenn-L SKI TOW)
PostPosted: Tue Nov 17, 2009 4:55 pm 
Offline

Joined: Thu Mar 01, 2007 8:52 am
Posts: 35
Location: Huntersville, NC
Ian & Duane,
re: strips up the inside of the hull

Actually these were going to be nailing battens for inside planking.
At the time, I thought it would be cool to mimic the inside of the boat
(from the cowling to the floor) with planking like on the outside.
But in the end I just used 1/4" plywood panels (cut from my 2" strip frame/template method)
and painted and varnished them. I stopped the panels at the tops of the frame gussets
in order to leave a 'toe kick'. It has worked out fairly well.


Top
 Profile  
 
 Post subject: Re: El Guapo is complete!!! (Glenn-L SKI TOW)
PostPosted: Tue Nov 17, 2009 9:21 pm 
Offline

Joined: Thu Aug 20, 2009 2:00 pm
Posts: 119
Location: Leduc (Edmonton), Alberta
If you got any photos of the inside walls/floor, it would be great to see them. Most project photo's seem to skim or skip over that part and I am still playing around with ideas on how I want to finish the inside. More ideas couldn't hurt ;)

_________________
Ian (aka Iggy)


Top
 Profile  
 
Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 28 posts ]  Go to page Previous  1, 2

All times are UTC - 8 hours [ DST ]


Who is online

Users browsing this forum: No registered users and 2 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Search for:
Jump to:  
Powered by phpBB © 2000, 2002, 2005, 2007 phpBB Group