Vee berth with chain locker beneath. The black pipe directs the chain into locker. This project is waiting for a slip, when the bottom will be painted and the boat launched. James is presently installing radar on the mast. The final touches to the interior will be finished after launch. The Starpath was not cleaned up for the photographing as there is work in progress all over the boat. |