Framing the SquirtScarf joints. Fitting the sheers. Fitting the chines. Tapering the keel at the stem. First layer of the chine. Checking the setback of the chine. Note block to represent the second chine layer. Checking fairness, again, using block to represent second chine layer. Chines and sheers installed. View from the transom. The stem has been faired. A lot of fairing. Ready for planking. |
|---|