Framing the Squirt

Squirt by McAdam 1

Scarf joints.

Squirt by McAdam 2

Fitting the sheers.

Squirt by McAdam 3

Squirt by McAdam 4

Fitting the chines.

Squirt by McAdam 5

Squirt by McAdam 6

Squirt by McAdam 7

Tapering the keel at the stem.

Squirt by McAdam 8

First layer of the chine.

Squirt by McAdam 9

Checking the setback of the chine. Note block to represent the second chine layer.

Squirt by McAdam 10

Checking fairness, again, using block to represent second chine layer.

Squirt by McAdam 10a

Squirt by McAdam 11

Squirt by McAdam 12

Squirt by McAdam 14

Chines and sheers installed.

Squirt by McAdam 15

Squirt by McAdam 16

View from the transom.

Squirt by McAdam 17

Squirt by McAdam 18

Squirt by McAdam 19

Squirt by McAdam 20

Squirt by McAdam 20a

Squirt by McAdam 21

The stem has been faired.

Squirt by McAdam 21c

Squirt by McAdam 22

Squirt by McAdam 23

Squirt by McAdam 24

A lot of fairing.

Squirt by McAdam 25

Squirt by McAdam 26

Squirt by McAdam 27

Squirt by McAdam 28

Ready for planking.

Squirt by McAdam 29

Return