A Perth Riviera # 8 - to October 2013
Posted by Andrew Crocker on Jan 28th 2014
After the diversion of the electrical system, installing the deck saw a return to normal boatbuilding. In retrospect, I was somewhat premature in this step as a number of things would have be
… read more