Blog

Looking for information on a specific boat design or topic?
Click on the search magnifying glass icon at the top left of this page and enter your search text

Malahini Boat Build By Elio Ascenzo- Stage 6

Malahini Boat Build By Elio Ascenzo- Stage 6

Posted by Elio Ascenzo on Aug 27th 2019

In this stage of building the Glen-L Malahini, I focused on the hardware, trailer set up, sign writing and registration for the boat. I also decided to add carpet to the floor. … read more
Riviera by Mike Yelverton

Riviera by Mike Yelverton

Posted by Mike Yelverton on Aug 26th 2019

Building the Riviera was a very long journey. You will find pictures in my Gallery that show it starting a long while back. It took two phases. Phase one, in the first home and shop took me to the co … read more
Malahini Boat Build By Elio Ascenzo- Stage 5

Malahini Boat Build By Elio Ascenzo- Stage 5

Posted by Elio Ascenzo on Aug 22nd 2019

During this stage of building the Glen-L Malahini, I sanded the timber back, applied 4 coats of epoxy and then applied paint and clear finish. I decided to go for a blue stripe in the middle of the bo … read more
Malahini Boat Build By Elio Ascenzo- Stage 3

Malahini Boat Build By Elio Ascenzo- Stage 3

Posted by Elio Ascenzo on Aug 15th 2019

In the third stage of the Glen-L Malahini build, I added fibre glass cloth to the base of the boat and also to the sides where the joints were. I then moved on to paint the bottom of the boat and want … read more
Malahini Boat Build By Elio Ascenzo- Stage 2

Malahini Boat Build By Elio Ascenzo- Stage 2

Posted by Elio Ascenzo on Aug 13th 2019

For the second stage of the Glen-L Malahini build, I chose to use a Sapelli Mahogany marine ply veneer. As the sheets weren't long enough, I had to put two joins in the boat, as seen in the images. … read more
Malahini Boat Build By Elio Ascenzo - Stage 1

Malahini Boat Build By Elio Ascenzo - Stage 1

Posted by Elio Ascenzo on Aug 9th 2019

I am Elio Ascenzo from Melbourne, Australia and when I decided to build the Glen-L Malahini, it was a bit more difficult starting off here in Melbourne as I didn't have the same timber choices as the … read more